Marshalls CPM – Goole

Marshalls CPM – Goole

 

  • Client: Marshalls CPM

  • Location: Goole

  • Product(s): Polyaspartic High Build Resin

  • Project Completion: 2022

  • Service: Internal Line Marking

Brief

Site safety is paramount for any company, especially companies operating machinery and vehicles. Here our client Marshalls CPM required the removal of their old failing line marking and full replacement with new more bold markings.

The project was delivered within the required timescales and completed in 2022 on budget.

 

 

 

 

Product

The old failing line marking was removed using our own specialist shotblasting equipment. This is a clean and efficient way of removing all old markings whislt also prepping the surface for the new material to be laid.

The product used for marking these internal lines was a premium polyaspartic high build resin. The great thing about polyaspartic high build resin is that it is very durable and more resistant to chipping scratches and scuffs due to its semi flexible structure.

This makes polyaspartic high build resin a better product for this installation compared to a standard epoxy.

To prevent operational downtime the project had to be completed quickly and systematically. Fastline Services Ltd achieved this by putting in place a detailed installation plan to ensure minimal operational disruption whilst the line marking was installed.

 

 

Result

Fastline Services Ltd has developed a name and reputation for high quality floor marking installations, all backed by the performance and customer service expected from a market leading company. Speaking of the Marshalls CPM project, Adam Fleming, director at Fastline said, “The weight of products and level of traffic at the Marshalls facility is considerable, so the method of preparation and paint system chosen was very important. Minimum disruption was a core requirement”

“It has been a great project to work on for the team. An installation plan and schedule were observed to ensure there was as little disruption as possible to Marshalls busy operations. The result is a first-class installation that meets all the client’s expectations.”